Abstract

The growth of marine containers transportation along with increasing complex container terminal logistic system (CTLS) has called for more effective approaches for scheduling container terminal resources. This paper discusses the problem of scheduling quay crane, yard crane and container truck for improving the container terminal productivity. One dynamic scheduling method and specific heuristic scheduling rules for dynamically assigning quay crane, yard crane and container trucks are proposed according to stowage plans and storage plans. A simulation model of a container terminal in Shanghai is built by the application of WITNESS2002, a simulation software package, to evaluate the efficiency of the dynamic scheduling method. From simulation results, the production efficiency increased about 8% by the dynamic scheduling method than static one previously discussed in CTLS.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.