Abstract

Due to the brittle rock deformation is not obvious, and the destruction process has the features of sudden and concealment, it is often neglected in the field during construction. In this paper, Brittle rock was selected as the research object. Using the vault subsidence as monitoring parameters, the excavation process was simulated in single line tunnel by the finite element analysis tool of ANSYS, we obtain the maximum displacement of brittle rock and stress variation with time. Then the subsidence effect of different buried condition were analyzed, to determine the stability period of IV Brittle surrounding rock. The research results can be used to guide the development of the monitoring standard, in underground engineering construction of the brittle rock.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.