Abstract
Aiming at the problenm of transportation to underground, and slinging, reshipment, assembly in underworkings for mining lage equipment , a set of slinging and reshipment system in the underground is developed. This system is a steel-frame structure consisted of multi-unit bridged structure junction,in which the double T-iron is taken as main load-bearing beam,and U-steel unit welded by back-to-back method is as a slanted prop triangle secondary beam.This system adoptes the three-dimensional modeling software Solidworks2007, and its COSMOS/Works modules, for the three-dimensional modeling and finite element analysis to this system. Through the finite element analysis, verified the correctness of the component design.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.