Abstract

The City government of Semarang has a plan to build a tram way in Semarang Old City Area as a public transportation mode to accommodate tourism activities. The existence of tram way can impact the performance of existing road network due to being built on existing roads side by side with other vehicles. Street network performances discussed in this paper are on the vehicle-kilometres travelled (VKT), and vehicle-hours travelled (VHT), to determine the aforementioned changes, traffic simulation was done with PTV VISSIM software. Vehicle-kilometres travelled decreased by 12,76%, vehicle-hours travelled increased by 10,54%. To minimize the impacts, two mitigation scenarios are simulated, mitigation 1 which is one-way system and mitigation 2 the combination of one-way system and signal optimizations. In mitigation scenario 1 the value of VKT decreased by 13,12%, VHT decreased by 0,65% compared to existing conditions. In mitigation scenario 2 the value of VKT decreased by 17,54%, VHT decreased by 4,93%.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call