Abstract
The following sequence of curve calculation is proposed in the point of confluence of main river and tributaries during flood of 1% probability on the example of Tisza River. The method of calculation was used to determine flood zones during flood of 1% probability and assessment of effectiveness of the proposed active and passive flood protection structures in the Basin of Tisza River.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.