Abstract

The following sequence of curve calculation is proposed in the point of confluence of main river and tributaries during flood of 1% probability on the example of Tisza River. The method of calculation was used to determine flood zones during flood of 1% probability and assessment of effectiveness of the proposed active and passive flood protection structures in the Basin of Tisza River.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.