Abstract
The 200 MWe Tonghae thermal power plant CFB boiler (2-units) is the largest boiler to fire a Korean anthracite coal for generation of electric power. The #1 unit CFB has been operated commercially since October 1998, and the #2 unit CFB, which will begin commercial operation in October 1999, is currently under construction. However, there is little operational data of the large CFB combustor firing anthracite coal, so it is necessary to predict the performance of the CFB combustor with variation of the operation conditions. Therefore, in this study, the simulation of the Tonghae CFB has been carried out to predict the performance with various nominal rates, coal particle size distribution and operating conditions. The simulation results with various loads could be fitted well to the design values at the given operation conditions. At the various operation conditions, the simulation results could explain the performance of the Tonghae CFBC well.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.