Abstract

PurposeThe purpose of this paper is to investigate the interactions between new product development (NPD) and engineering change management (ECM) processes in terms of their impact on organizational performance.Design/methodology/approachA system dynamics model of the NPD and ECM processes within an organization has been built and simulated for a range of parameter values to investigate the interactions between the two processes.FindingsThe effect of various parameters on the lead‐time of the NPD process varies with different process environments. No single process management policy is advantageous for most if not all process operating conditions, thus it is important to change the critical parameters of the process every time.Research limitations/implicationsThe accuracy of the estimated effect of parameters on the lead‐time depends on the accuracy of estimated parameter values.Practical implicationsThe insights developed from the results would be useful for managers in planning their process management policies under various circumstances.Originality/valueThe study of interactions between the ECM and NPD processes has been scarce. This research would be very helpful to managers who plan the process managing strategies given various circumstances such as limited resources.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.