Abstract
This paper introduces a simulation system for real-world control problems during high-speed railway train operation, based on a semi-physical model of scale miniatures of railway lines, stations, and sections, signals and trains. This paper also designs a control command set based on the LocoNet-Protocol, puts forward an algorithm which translates train operation to a control command, builds an integrated model of high-speed train operation and control. The system could verify the principal parameters of high-speed train operation, and analyzes safety performances of high-speed railway. It can also simulate a whole transportation plan of a high-speed railway in off-line mode.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.