Abstract
In this work, the wind resource of the islands of San Andrés was studied during the years 2011 - 2012 to determine its electric energy potential. Wind speed and direction taken from the mereology station of IDEAM located at the Gustavo Rojas Pinilla airport were used for modeling the electric energy obtained from different types of wind turbines and their location height. The maximum energy obtained was 5496.6 MWh/year using a wind turbine of 3.75 MW power. However, the economic analysis indicated that Neg Micon's 2.75 MW wind turbine has the lowest generation cost of US$ 0.04/kWh and an energy production of 4,919.1 MWh/year. According to this, for a sale price of US$ 0.14 /kWh, the net present value (NPV) would be US$ 5,928,594.9 the internal rate of return (IRR) of 16%, and the investment recovery time (TRI) of almost 4.1 years, making the wind project attractive for investors.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.