Abstract

The process of Dimethyl ether(DME) production consists of the four parts which are syngas synthesis from natural gas, absorbing CO 2 from syngas, DME synthesis reactor and DME separation/purification. KOGAS has developed a process in which syngas is produced from natural gas and converted to DME using a single reactor[1]. For the construction of commercial scale DME plant, the modeling of one-step DME synthesis reactor is required prior to beginning the construction. Since then, the simulation of DME production process should represent actual operation data of pilot or demo scale plant. The simulations of reactor had been conducted using a one-dimensional steady-state model of a shell-and-tube type fixed-bed reactor[2]. Using the result of a reactor analysis, we have conducted simulations of all processes using steady-state models in Aspen Plus®. The simulation of process in this paper reflects the result of a reactor simulation and the real operation data of demo scale DME plant. And the simulation results are satisfied with the requirements for the basic design and engineering of commercial DME plant construction.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.