Abstract
This paper discusses a simulation aided approach of economy and productivity measures for organizational changes based on activity costs. The procedure is supported by the simulation package FEMOS in order to evaluate the planned production system dynamically. During the simulation run the activities will be executed exploiting the resource capacities of the system. The activity costs are calculated based on a resource cost model. This model consists of static cost factors for the resources which will be adapted during simulation in order to take into account the actual or planned production situation. With the help of an example it can be shown, that the calculation of activity costs is useful in reengineering processes.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.