Abstract

This paper analyzes an existing production system in an industrial hall, consisting of 11 machines (service stations) and 13 intermediate stocks (queues), where 4 types of parts are processed and assembled, with the aim of increasing production volume. The Queuing System Simulation module of the WinQSB software is used, which allows the simulation of waiting systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.