Abstract

Renewable energy sources, presently constituting about 23% of the total Italian power production, are featured by very discontinuous supply during the day that, to avoid grid malfunctions, must be compensated by fossil fuelled power plants. The latter must hence be able to rapidly control power supply.This paper proposes a power regulation system for coal power plants, consisting in the bypass of the low pressure pre-heaters in order to increase the steam flow-rate in turbine. The main advantage of this system is the limited thermo-mechanical stress induced in the pre-heaters. The solution effectiveness is investigated through a Matlab-Simulink model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.