Abstract

In cold regions, weather introduces a great deal of uncertainty to weather-sensitive construction activities, resulting in project schedules that deviate from plans. To maximize construction process productivity, decisions regarding process execution planning and sequence of work need to be made, based on reliable plans and schedules. Faced with winter weather uncertainty in cold regions, this task becomes quite challenging. This paper follows the framework that was proposed in the literature for simulating weather-sensitive construction projects executed under cold weather conditions. In the literature, the authors applied the framework steps to enable simulating and planning pipeline construction activities under severe cold weather. The proposed framework sets out a work breakdown structure of activities to account for and quantify weather impact on the project schedule. The steps outlined in the framework are followed to enable simulating and planning tunnelling construction activities executed under severe cold weather conditions. Relevant simulation findings, which clarify the impact of cold weather events on construction projects and can assist in project planning and decision support, are reported.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.