Abstract

A new topping cycle coal power generation process is to be developed as a Japanese national project of high efficiency power generation process of coal. This process consists of a combination system of a pressurized bubbling fluidized-bed coal gasifier and a pressurized bubbling fluidized-bed combustor in series. To evaluate the performances and also to determine specifications and operation parameters of this process, it is extremely important to analyze the behavior and the performance of this system by a reasonable simulation model. A simulation model of this new process is developed in this paper. It is demonstrated by calculated results from this model that the carbon conversion in the gasifier, the composition and the heating value of produced gas are strongly dependent on operating conditions. Heat recovery by the steam in the combustor is also estimated as the function of coal feed rate.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.