Abstract

Purpose – The purpose of this paper is to develop a simulation model capable of capturing the complex variables impacting the productivity of tunneling construction projects.Design/methodology/approach – Simulation modeling is used to construct high‐level models of construction supply networks in order to perform quantitative analysis, enabling planners to work out the embedded complexities of the system.Findings – This study presents a detailed simulation model of a real life tunnel construction project along with its supply chain of liner segments. Using this detailed model, a sensitivity analysis for the tunneling project shows the impact of chosen variables on the duration of a tunneling project; these results are used to verify the importance of considering the whole supply chain of a construction project in the planning stage.Practical implications – Effective quality control, consideration of the shortage of storage space, and anticipation of required lead time when placing the first order to achie...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call