Abstract

The production of large-sized machines or facilities is fundamentally different from the usual manufacturing processes. Mostly it is a fixed-site production, dominated by typical assembly processes instead of linear operation sequences in the known flow shop or job shop problems. To describe these processes, several graph methods were developed in the past, i.e. AND/OR-graphs or modified Petri nets, but most of them are static methods and they are not suitable for scheduling tasks. This paper demonstrates how Timed AND/OR-graphs can be modelled with a common discrete event simulation (DES) system. The objective is a simulation-based scheduling system for assembly processes which is able to improve the prediction of due date keeping as well as to optimise the workflow of the assembly systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.