Abstract
ABSTRACT With increasing product complexity, sophistication and customization, Assemble-to-Order (ATO) systems have gained a lot of popularity in recent years. ATO systems have the advantage of delivering customer orders at shorter leadtimes by manufacturing components to stock. However, for an on-time delivery of the final assembled product, the corresponding components must be replenished and be available when needed for assembly in a timely yet cost-effective manner. This research investigates the production and subcontracting decisions in the multi-product ATO systems. We also provide insights on resource allocation decisions among various components and how does randomness in the service times impact these decisions. Using, Monte Carlo simulation approach, we identified that when the manufacturer is cheaper the direction towards optimality is by having the threshold values kept close to the base stock level for all components.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.