Abstract

This paper describes a discrete-event simulation that incorporates the critical path method (CPM) in generating comprehensive information for construction project scheduling or planning. An activity-based graphical model able to consider complexities in construction, for example, unbalanced logical dependencies, unbalanced resource involvements and repetitive activity operation is proposed. An activity scanning (AS)-based forward pass algorithm for early-time information and a backward search algorithm for late-time information are developed. The simulation results that include both resource utilization statistics and late-time information (i.e. latest start or finish time and total float (TF)) of every activity for each cycle of operation cannot be easily achieved through traditional simulation or CPM. Illustrations demonstrate the advantages of the activity-based graphical model and the impacts of resource allocation policies on the schedule. The proposed methodology aims at widening the application of construction simulation by providing float time information and enhanced modelling capability.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.