Abstract

Based on the remanufacturing idea, taking the CH Company for the research case, the forward and reverse logistics processes of the household electrical appliances were simulated and optimized systemically through Flexsim. Through method study technique, the process for recovery, dismantling and remanufacturing of waste TV were analyzed qualitatively and quantitatively and the model of production logistics system was built. From this model, the bottlenecks of the total logistics system can be identified, and the corresponding improved program and a comprehensive evaluation can be suggested reasonably. The results indicate that, based on the simulation in this work, the system technical indexes, such as T, Q, C and S, can be improved greatly by optimizing household electrical appliances remanufacturing production logistics system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call