Abstract

The CVT equipment running on site is slightly modified to form a hybrid CVT to achieve transient overvoltage measurement, which is theoretically feasible and practical. In order to study the voltage division method based on the hybrid CVT to measure the overvoltage of the power system, that is, the low voltage capacitor C3 is connected in series between the low voltage terminal of the medium voltage capacitor C2 of the traditional CVT and the ground, and the transient overvoltage measurement is realized through C3. This article uses ATP-EMTP to establish its high-frequency transient model for simulation analysis. For further verification, a power frequency voltage test and an impulse voltage test were carried out on the 110kV hybrid CVT produced by Taikai Transformer Factory, focusing on the analysis of the partial voltage characteristics of the capacitor C3. The simulation results show that the C3 partial pressure method can achieve a relatively accurate measurement of the transient overvoltage. The test results show that the voltage across C3 is affected by uncertain factors and has an impact phenomenon. The above analysis process and results have certain practical value for designing actual products.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.