Abstract

The hall of Wuhan Dazhi road station of urban rail transit is modelled by Anylogic. Based on the data surveyed in the morning peak period of some workday, walking paths of pedestrians are simulated and utilization of equipments is analyzed. To reduce pedestrian waiting time, security checkpoints are added. Then the average passage time going through the station hall is reduced.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call