Abstract
When the highway traffic accident happened, the capacity will decrease, and if the upstream traffic volume was more than the remaining capacity, the traffic jam will happen. The simulation software VISSIM was used to simulate and analyze the highway traffic accident under different number of blocked lane, upstream traffic volume and traffic accident duration. Simulation result shows that, the capacity has something to do with the number of blocked lane, but has nothing to do with the location of traffic accident. The time of biggest delay has something to do with the number of blocked lane and traffic accident duration, but has nothing to do with the upstream traffic volume. The capacity has nothing to do with traffic accident duration. The longer traffic accident duration, the more delay. And the queue length increases when the number of blocked lane, upstream traffic volume and traffic accident duration increase.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.