Abstract

Based on the simulation of the air conditioning construction dynamic load and simulation calculation of air-source gas engine-driven heat pump (GEHP), the air-source GEHP air conditioning in winter, summer and the annual primary energy ratio are analyzed in simulation with the combination of a hotel building in Tianjin. Firstly, DeST software is used to simulate all-year hourly air conditioning load of the building. Then air-source GEHP simulation model [1] is used to calculate the annual hourly gas consumption and the amount of GEHP's gas consumption in winter, summer and a total year afterwards can be got. At the same time, by the analysis of waste heat recovery of gas engine-driven, primary energy ratio for air-source GEHP in Tianjin is given under the different waste heat recovery of winter, summer and the annual.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.