Abstract

With economic development and scientific and technological progress, industrial and agricultural production and household power consumption have increased year by year, and power grid construction has also achieved unprecedented development. The continuous improvement of transmission line capacity and voltage level also leads to the gradual increase of new lines crossing existing lines in practical projects. In this paper, based on the hydraulic synchronous inverted hoisting crossing device of transmission line based on artificial intelligence, the basic requirements of hydraulic hoist and joint simulation and transmission line route selection are discussed; During the simulation, the deviation of the hydraulic transmission line is always increased by [- 19.5] in the area of [−46] in the simulation test, according to the variation of the hydraulic transmission line speed in the area of [- 19.5]. In this paper, according to the general situation, the fuzzy universe of E and EC is defined as [- 6,6].

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.