Abstract

Traditional mine planning based on block models built with interpolation techniques such as kriging does not take into account the uncertainty associated with the estimates. These models are inadequate for short-range mine planning. In contrast, conditionally simulated models reproduce the actual variability (histogram) and spatial continuity (variogram) of the attributes of interest. Conditional simulation can be used to address the problem of measuring the uncertainty associated with an estimate. This paper outlines how the sequential Gaussian conditional simulation algorithm can be used to assess uncertainty of grade estimates and also illustrates how simulated models can be incorporated into mine planning and scheduling. A case study demonstrates the efficiency of the method in assessing risk associated with geological and engineering variables.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.