Abstract

This article describes an attempt at simulating a remote cranking operation for the black start of two coal-fired drum-type power generation units at Northern States Power Company, USA. The simulation system uses power flow and generator reactive capability programs in an iterative process to determine the appropriate tap positions for the combustion turbine (CT) unit and auxiliary transformers, the various transformers installed in the steam power plant path, and for controlling a proper voltage level for the generator system bus at the CT plant.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.