Abstract
AbstractIn natural floodplains, the grassed areas usually entrap fine suspended sediments (wash products rich in nutrients) of the floodwater, thus contributing to the process of self-purification. However, hydroelectric power plants (HPPs), built with the purpose of employing the renewable energy, can worsen this process, it occurs if they pond the floodplains and decrease these grassed areas. In the present paper, the sediment deposition in the floodplains with existing weir heights is investigated. The mathematical-hydraulic model is used for it. The 12 km length interval of the river Virvyte, having three ponds was investigated. The average volume of sedimentation in this region is 500–2000 t/year, i.e. quite large. In the investigated region of the river Virvyte, the sediment deposition decreased by about 50%, due to the impact of a too high dam (H=5.5 m) of the Kapėnai HPP.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Environmental Engineering and Landscape Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.