Abstract

Dispatchers often set noncrossing block sections (NCBSs) for railway out-of-gauge train (OGT) running on double-track railway line for safety reasons. In this paper, we will investigate the best location, length, and number of noncrossing block sections to reduce railway capacity loss due to the operation of OGTs. Firstly, yielding, overtaking, stopping, starting, and other operation rules for OGTs running on double-track railway line were designed, and a simulation model based on cellular automata was further put forward. Then, an assessment model for double-track railway line capacity loss due to the operation of OGTs was set up. Some simulation experiments and the comparisons of these results were further given to achieve the optimal setting of NCBS for OGTs running on double-track railway line. In the case of NCBSs number minus one, capacity loss caused by the operation of OGTs can be reduced up to 15.2% in the upstream direction and 6.3% in the downstream direction. Also, the NCBSs should lie at the nearest block sections (BSs) to depot stations and the NCBSs lengths should be as less as possible.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.