Abstract

Since the pre-stressed anchor technology became to be used from the beginning of twentieth century, it is widely used with the advantages of its good applicability, high cost performance, good looking appearance and easy green. Pre-stressed anchor achieves the purpose of actively controlling foundation pit deformation by exerting pre-stress on steel strand of its free section. This thesis chooses deep foundation pit engineering, adopt Mohr-Coulomb ideal soil body by finite difference software FLAC3D, and select different anchor pre-tension values to simulate. It combines Lizheng software to do numerical simulation and analytic study on pile-anchor supporting structure. This thesis compares results coming from the two kinds of software, and analyze the impact on row piles' body bending moment, pile top deformation, anchor cable axial force and foundation pit deformation when pre-tension changes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.