Abstract

Inverted siphon, such a thin-walled structure, tends to have large internal and external temperature differences during the early stage of pouring, resulting in a large tensile stress on the surface. Once surface or penetrating cracks appear, it will have a great influence on the integrity, safety, impermeability and durability of the structure and reduce the water transfer function. The temperature control simulation of the Liyanghe inverted siphon in the middle line of South-to-north Water Diversion project was designed to select the temperature control measures of inverted siphon concrete during different month construction. Temperature control measures can provide references for similar projects at home and abroad.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.