Abstract

<p>The movable formwork has the characteristics of light self weight, large bearing capacity, small rod type number, rapid assembling, and simplicity to construct. Therefore, when cast-in-situ concrete box girder is constructed, the moveable formwork has great meanings in cost reduction and project time limit shortening. By using this method, the difficulty that brackets cannot be distributed as the ground bearing capacity of bridges. Besides that, bridge sites is low is reasonably solved, cost of material and labor can be reduced, influence to underbridge is minimize, and the construction progress is accelerated. The simply-supported box girder construction technique of 40 m movable formwork method cast-in-situ railway passenger dedicated line is particularly analyzed.<strong></strong></p>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.