Abstract

Ion implanted PERC cells have already achieved power conversion efficiencies of about 20.0%. The process flows reported in the literature for the ion implanted PERC cells with commonly utilized Al2O3/SiNx rear passivation stack, which has the benefit of being less sensitive to surface roughness than SiO2/SiNx stack passivation, notably suffer from the additional process steps such as single side polishing and single side protection. Here, we present a simplified process flow for the fabrication of ion implanted PERC cells having Al2O3/SiNx stack passivation at the textured rear surface without any rear side processing, leading to a power conversion efficiency of 20% at large area. In this context, we show the sensitivity of solar cell efficiency to firing peak temperature, implantation dose, and Al2O3 thickness. The results of the present research will provide a basis for high efficiency implanted PERC cells with significantly reduced workload and cost.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.