Abstract

Settlement induced by new tunneling is important in assessing the safety of existing tunnel. A simplified settlement calculation method for the existing tunnel was obtained based on the two-step method. Firstly, ground settlement induced by tunneling was calculated using experimental method and elastic method. Then the entire tunnel deformation can be calculated using elastic-foundation-beam model and the ground settlement obtained in the first step was applied on the existing tunnel as a passive settlement load. Finally, the simplified method was verified by the results from modal test. The results show that the simplified method is available for calculating settlement of existing tunnel induced by new tunneling. Parametric study also studied in the paper, it is found that the tunnel settlement induced by tunneling increases with the increasing ground loss and decreases with the increasing net distance between new tunnel and existing tunnel. The settlement of tunnel with larger depth and harder soil stiffness is larger than the one with lower depth and softer soil when the ground loss is same.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.