Abstract

A simple, graphical, unit block approach for rapid complex pressure swing adsorption (PSA) cycle scheduling has been developed. This new methodology involves a priori specifying the cycle steps, their sequence, and the number of beds, and then following a systematic procedure that requires filling in a 2-D grid. The outcome or solution is a unit block which can easily be extended to form the complete cycle schedule. This new approach has been tested successfully against several multi-bed and multi-step cycle schedules taken from the literature. It should thus be very useful for quickly scrutinizing different PSA cycle schedules for further PSA process development.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.