Abstract
The deformation of the overlay pipeline caused by the excavation of the soil tunnel in the case of small spacing cannot be ignored. Based on the experience of previous engineering, this paper assumes that the settlement of the overlying pipeline caused by tunnel excavation satisfies the basic morphology of Gaussian distribution. On this basis, the soil displacement is converted into load acting on the pipeline, and the energy variation principle is introduced, and the energy variation equation of the pipe‐soil system is established, which is iteratively solved based on the principle of minimum potential energy, so as to obtain the calculation method of overlay pipeline vertical deformation caused by soil tunnel excavation, which is more simple and practical than the previous method. The calculation results were compared with the existing tests and engineering examples to verify the correctness of the proposed formula. Finally, the influence of pipeline material, formation loss rate, and intersection angle between the tunnel and pipeline on pipeline vertical deformation was analyzed. The comparative analysis shows that the pipeline deformation decreases with the increase of tunnel angle and pipeline elastic modulus, but increases with the increase of formation loss rate.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
More From: Advances in Civil Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.