Abstract

Illinois began full transition to the American Association of State Highway and Transportation Officials load and resistance factor design (LRFD) bridge design specifications from the traditional load factor design code or standard specifications in 2002. To facilitate implementation of the new specification, engineers from the Illinois Department of Transportation undertook a series of investigations. The studies focused on interpretation of LRFD for the design of typical bridges in Illinois and the simplification of its procedures for determination of live load lane distributions to primary superstructure girders. Some important presented results from the conducted investigations are believed not only relevant to bridge design in Illinois, but to other states and jurisdictions which employ or will employ LRFD in the near future. The initial simplifications and interpretations focused on concrete deck-on-steel girder bridges and were subsequently expanded to include concrete deck-on-prestressed concrete ...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.