Abstract

In order to determine the distribution of live load on the in-service bridge pile, the live load were statistically analyzed that the distribution at the end of the beam at the fulcrum of the beam and the T beam in the middle and small span of the highway bridge, the proportion of live load is obtained in the counter force at the end of the beam. According to the statistical results, the corresponding relationship between the ratio of cyclic loading and the span of highway bridge is established, and according to the traffic volume and the effective number of trips calculated by different types of vehicles, the relation between the number of cyclic loads and the operation time of the bridge pile foundation is analyzed. The above results were combined with the time cycle of the vehicle on the bridge, a simplified calculation model of static load and live load on bridge pile foundation is established, which the obtained results can be directly applied to the test and loading of in-service bridge pile foundation and to guide the single pile model test in the laboratory, and has a strong application value.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.