Abstract
A simple modification of existing divisible load scheduling algorithms, boosting link speed by M for M parallel channels per link, allows time optimal load scheduling and performance prediction for parallel channel systems. The situation for multicore models is more complex but can be handled by a substitution involving equivalent processor speed. These modifications yield upper bounds on such parallel systems' performance. This concept is illustrated for ideal single level (star) tree networks under a variety of scheduling policies. Less than ideal parallelism can also be modeled though mechanisms of inefficiency require further research.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.