Abstract

A simple modification of existing divisible load scheduling algorithms, boosting link speed by M for M parallel channels per link, allows time optimal load scheduling and performance prediction for parallel channel systems. The situation for multicore models is more complex but can be handled by a substitution involving equivalent processor speed. These modifications yield upper bounds on such parallel systems' performance. This concept is illustrated for ideal single level (star) tree networks under a variety of scheduling policies. Less than ideal parallelism can also be modeled though mechanisms of inefficiency require further research.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.