Abstract
Applicability of delay time analysis as a tool for downtime reduction in industry has been already proved through case studies decades ago. This article attempts to encourage the SMEs to implement the technique for downtime management by providing a startup method of implementation by consultants. The algorithm shall be more suitable for those small /medium scale industries engaging continuous production lines that are on the lookout of reducing downtimes or cost of breakdowns. Sample numerical examples and the graphical solution while arriving at optimization of downtime are shown for use by practitioners.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.