Abstract

In groundwater construction projects, many variables affect construction schedule and cost overruns. This paper aims to examine and evaluate the relative importance of the main factors that cause delay and cost overruns in groundwater construction projects. In order to identify these factors, a questionnaire survey was conducted. Questionnaires were sent to professionals involved in groundwater construction projects in Ghana. The data was analyzed and ranked, based on the profession of the respondents and their roles in the industry (i.e. owners, contractors and consultants). The questionnaire survey consisted of 49 factors which were grouped into nine major categories, and the level of importance of the categories was measured and ranked by the relative importance weights. The percentage agreements in ranking among the three groups were measured. The results shows that: (1) the surveyed groups generally agreed that the project financing category is the main reason for groundwater construction delay and cost overruns, whereas the labor category is the least; (2) owners, consultants and contractors substantially agree on the ranking of the major categories of delay and cost overruns factors. The paper concludes that all the three groups felt that project financing, micro-economics, natural conditions and materials factor categories play a predominant role in causing delay and cost overruns to groundwater construction projects.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.