Abstract

This paper sets out a procedure for the analysis of piled raft foundation systems. It is based on an elastic formulation initially, but makes approximate allowances for non-linear raft behaviour by imposing an upper limit on the contact pressure between the raft and the underlying soil, and for nonlinear pile behaviour by assuming that the pile behaviour can be characterized by a hyperbolic load-settlement curve. It also makes approximate allowances for the various components of interaction within the foundation system. Examples are given to demonstrate the importance of taking non-linearity and pile-raft interaction into account with respect to settlement, differential settlement, pile load distribution and raft bending moments.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.