Abstract
The paper describes a new benchmark, performed as a preliminary experiment on JET tokamak during the last shutdown. Dose rate has been measured with different dosimeters along the axis of the main horizontal port of Octant 1, from the plasma centre to 1m outside the port at various times after shutdown. The activation dose from the horizontal neutron camera, moved outside the torus hall during the shutdown, has also been assessed. The measured values have been compared with dose rates calculated using an Advanced-D1S method in which new computation capabilities have been introduced, such as dose rate spatial mesh map and automated time behaviour.Measurements along the axis of the horizontal port are well predicted by the calculation. With few exceptions, the D1S estimation is within the error of the measurements. The activation of the horizontal camera is underestimated by a factor of 2. However, more accurate measurements are needed to reduce the uncertainties.The Advanced-D1S method, the results and implications of the benchmark are presented and discussed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.