Abstract
This paper presents a novel operational scheme for enhanced utilization of late-life shale multi-well systems. These systems are characterized by a large number of geographically spread wells and pads, where a substantial number of the wells are producing at low erratic rates due to reservoir pressure depletion and well liquid loading. By applying a cyclic shut-in and production strategy, the scheme avoids well liquid loading and optimizes the production from a set of late-life wells at a shared production pad. The scheduling of well shut-ins is formulated as a generalized disjunctive program (GDP), using a novel shale-gas well and reservoir proxy model. The GDP formulation lends itself both to a complete MILP reformulation and reduced size MINLP reformulations; a computational study indicates in favor of the MILP formulation. We include numerical examples to demonstrate the potential benefit of applying the proposed cyclic scheme compared to a non-optimized approach.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.