Abstract

With the past high economic growth period in Japan, the power demand has been increasing sharply year by year. Therefore, the Japanese utilities have installed many Shunt Capacitors (SCs) along with the predicted demand in order to keep the voltage profile and stability. Meanwhile, some SCs have aged because they have been used for a long time, and thus, have to be replaced sometime soon. Recently, the usage of the concept of asset managements has been paid attention as economic evaluation techniques in the power system. Therefore we propose a new renewal planning method with cost leveling during the renewal period using the condition age model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.