Abstract

ABSTRACT: The probable maximum flood (PMF) currently serves as the design standard for many U.S. dams. Floods used for design have increased and currently thousands of dams in the U.S. would be overtopped and possibly fail using the latest calculated PMF at each dam site. Some researchers have suggested that modifying dams to accommodate the PMF could be wasteful. Objections to using the PMF for dam modification include: (1) larger spillway capacity may increase annual downstream flood losses, (2) benefit‐cost ratios may be low, (3) construction accidents associated with dam modification may cause fatalities, and (4) the dollar amount spent to save lives by making dams safer is often very high. Based on these objections, a procedure is presented for evaluating the effectiveness of a proposed dam modification. A change in spillway design policy is recommended. Accepting the status quo at a dam that cannot accommodate the PMF may be the best course of action.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.