Abstract
Optimal generation scheduling of hydro-based power units has a significant place in electric power systems, which considerably has been dealt with as a subject of investigations for several years. Hydrothermal system is introduced as an important hydro-based power generation system. The objective of short-term hydrothermal scheduling (STHS) problem is obtaining the power generation schedule of the available hydro and thermal power units, which aims to minimize total fuel cost of thermal plants during a determined time period. Many conventional optimization procedures are first introduced for solving STHS problem. Recently, heuristic and meta-heuristic optimization methods, which are defined as an experience-based procedure, are implemented for obtaining optimal solution of generation planning of hydrothermal systems. This paper provides a comprehensive review on the application of heuristic methods to obtain optimal generation scheduling of hydrothermal systems, which compares the implemented procedures from different points of view. Optimal solutions obtained by employment of multiple heuristic and meta-heuristic optimization methods for different test instances are demonstrated and the introduced methods are compared in terms of convergence speed, attained optimal solutions, and constraints. Future research trends are discussed, which can be introduced as the subject of studies in the area of STHS problem.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.