Abstract

A dynamic and linear programming-based approach is investigated for the short-term scheduling of thermal power plant units considering the security and environmental constraints of electric power systems. In addition to the basic constraints (i.e. real power limits of the generators, real power demand, spinning reserve, minimum up and down lime of units) a comprehensive set of constraints is considered including: transmission line capacity limits; generators dynamic ramp rate; voltage security margin; and environmental issues. An optimal multiplier continuation method is adopted to effectively calculate the voltage security margin. The constraint relating to the voltage security margin is considered as a transition constraint in the dynamic programming process. The environmental issue is considered as a restriction on the hourly SO/sub 2/ emission allowances and other constraints are considered in the dynamic/linear programming procedures. Results of the application of the proposed algorithm to a test system are presented to illustrate the effectiveness of the approach.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.