Abstract

This work presents a new variant of a unit-specific event-based model for short-term scheduling of batch plants. The motivation behind the proposed model is to further reduce number of events necessary to efficiently solve a given scheduling model. The main novelty in the proposed formulation is that the production and consumption tasks of each intermediate state are modeled to take place at the same event, in contrast to existing batch scheduling models where the consumption tasks normally start at the next event compared to the production tasks. This is the first time such a feature has been attempted in batch process scheduling, although it has been done in scheduling of continuous plants. Also, this is the first attempt where we are able to model the unit-specific events in their true sense, where the first event in each unit actually takes up the first event. The model is primarily applicable and useful for problems involving no recycle streams, although a hybrid approach has been suggested for probl...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.