Abstract
In the new power system with high proportion of uncertain renewable energy sources (RES), there is a defect of RES consumption at the expense of other power sources' operational efficiency. This paper proposes a short-term optimal scheduling model of wind-photovoltaic-hydropower-thermal-pumped hydro storage (WPHTPHS) coupled system, which realizes the multiple optimization objectives involving minimizing operation cost of thermal power units, maximizing clean energy power generation, minimizing net load fluctuation and thermal power regulation. First, to overcome the dimension disaster problem in the solution space of high-dimensional random variables, a method for pre-solving integer state variables is proposed. Then, a novel multi-objective solution strategy of priority stratification-coupled feedback combined with improved plant growth simulation algorithm is designed. Finally, the effectiveness and superiority of the proposed model and solution method are demonstrated by case studies, and the numerical results show that the number of startups and shutdowns, standard deviation of output and operating cost of thermal power units are reduced by 90.9 %, 65.34 %, and 14.01 % respectively, compared with traditional wind-photovoltaic-thermal strategy. This study contributes to resolving the relationship between conflicting objectives and highlighting the potential advantages of WPHTPHS coupled system to maximize overall performance from economic and stability perspectives.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.